Core meltdown retention basin
scroll 
Construction in a reactor to collect and cool the molten
reactor core. The reactor pit is designed to collect the liquid molten
metal mass generated during a core meltdown accident and guided by gravity
to a lower-level area made of refractory material over which the molten
mass spreads and the energy contained in it can be removed by cooling
and the molten mass solidifies.
back
|
|

11 - 15 March 2018
Munich, Germany

30 September - 04 October 2018
Prague, Czech Republic |