FR 2
scroll
First reactor in the Federal Republic of Germany built on the basis
of a national concept and independently in the Research Centre Karlsruhe.
The FR 2 was a D2O-moderated and cooled research reactor
using UO2 enriched to 2% as a fuel and with a power of 44
MW. The reactor entered operation on 7th March 1961. Following 20 years
of operation without considerable malfunctions the FR 2 was finally
shutdown on 21st Dec. 1981. The aim of the decommissioning measure -
the safe inclusion of the reactor unit - and the disassembly of all
residual systems was reached in November 1996.