ENS



 

Reprocessing Plant Karlsruhe

scroll

The Reprocessing Plant Karlsruhe (WAK - Wiederaufarbeitungsanlage Karlsruhe) was designed for a throughput of a maximum of 35 t uranium at 200 days of operation per year with an enrichment of up to 3% U-235 equivalent. The disintegration of the fuel elements was effected in the chop-leach process, the U/Pu separation in the dual-cyclical PUREX process with 30% TBP in n-dodecane. Since the commissioning of the plant in 1971, about 200 t irradiated fuel was reprocessed and more than 1 t plutonium separated until the end of the operation in 1990. The total plutonium separated in this plant is equal to an energy content of 1.5 million t hard coal at a fissile share of 70%. The high active liquid waste of 60 m3 which resulted during the reprocessing is stored on the premises of the WAK. The Vitrification Plant Karlsruhe is presently erected on the premises of the WAK for the waste solidification in order to obtain a product suitable for ultimate disposal. The dismantling work of the WAK began in 1996.

 

 

 


 

 


 

ENS conferences

 
TopSafe 2017

TopSafe 2017
12-16 Feb. 2017
Vienna, Austria

PIME 2017

PIME 2017
19 - 22 March 2017, Middelburg Netherlands

RRFM 2017

RRFM 2017
14 - 18 May 2017 in Rotterdam, Netherlands

ETRAP 2017

ETRAP 2017
30 May - 2 June 2017, Valencia, Spain