Reprocessing Plant Karlsruhe
scroll
The Reprocessing Plant Karlsruhe (WAK - Wiederaufarbeitungsanlage
Karlsruhe) was designed for a throughput of a maximum of 35 t uranium
at 200 days of operation per year with an enrichment of up to 3% U-235
equivalent. The disintegration of the fuel elements was effected in
the chop-leach process, the U/Pu separation
in the dual-cyclical PUREX process with
30% TBP in n-dodecane. Since the commissioning of the plant in 1971,
about 200 t irradiated fuel was reprocessed and more than 1 t plutonium
separated until the end of the operation in 1990. The total plutonium
separated in this plant is equal to an energy content of 1.5 million
t hard coal at a fissile share of 70%. The high active liquid waste
of 60 m3 which resulted during the reprocessing is stored
on the premises of the WAK. The Vitrification
Plant Karlsruhe is presently erected on the premises of the WAK
for the waste solidification in order to obtain a product suitable for
ultimate disposal. The dismantling work of the WAK began in 1996.
|
|
ENS conferences |
|
|
TopSafe 2017
12-16 Feb. 2017
Vienna, Austria |
|
PIME 2017
19 - 22 March 2017, Middelburg Netherlands |
|
RRFM 2017
14 - 18 May 2017 in Rotterdam, Netherlands |
|
ETRAP 2017
30 May - 2 June 2017, Valencia, Spain |
|
|