Nuclear Power Plant Philippsburg/Rhine, unit 1, boiling
water reactor with an electric gross output of 926 MW, nuclear commissioning
on 9th March 1979, final shutdown on 17th March 2011. Lifetime electricity generation: 186.8 TWh.