Issue No. 42 Autumn
(November 2013)

C O N T E N T S

ENS News
_______________

Word from the President

Obituary

ENS 2014 Career Convention

ENS High Scientific Council Position Paper

ENS Events
_______________

NESTet 2013

PIME 2014

RRFM 2014

ENC 2014

Member Societies
__________________

SNE News

Technology research - the SUSEN project and the nuclear fuel cycle (JPC)

NUCLEAR OPTION IN COUNTRIES WITH SMALL AND MEDIUM ELECTRICITY GRIDS

YGN Report
__________________

SNUS at Pohoda – again with Info-kiosk

A Young Generation Network initiative on the role and expectations of the Bulgarian nuclear society

Country Report - France

Interview with Mr François GAUCHÉ, CEA

Members of the Czech and Slovak YGNs take part in joint retreat

Corporate Members
__________________

L-3 MAPPS Successfully Completes Major Projects for Eskom’s Koeberg Power Station in South Africa

High temperature furnace

Specialist Engineering for Supply, Interim Storage and Logistics

ENUSA’s strategy for gaining access to international nuclear fuel markets

MYRRHA takes a step closer to realization

ENS World News
__________________

TRASNUSAFE - Training Schemes On Nuclear Safety Culture

PROMOTING ECVET IMPLEMENTATION

The ECVET-oriented Nuclear Job Taxonomy: a European cooperative project

ENS sponsored conferences

ENS Members
_______________

Links to ENS Member Societies

Links to ENS Corporate Members


Editorial staff
______________________

____________________
PIME 2014

PIME 2014
16 - 19 February 2014 in Ljubljana, Slovenia

____________________
RRFM 2014

RRFM 2014
30 March - 3 April 2014 in Ljubljana, Slovenia

____________________
ENC 2014

ENC 2014
11 - 15 May 2014 in Marseille, France

____________________
TopFuel 2015

Topfuel 2015
13 - 17 September 2015 in Zurich, Switzerland


Kernkraftwerk Goesgen

Specialist Engineering for Supply, Interim Storage and Logistics

Electrical power is the key energy source essential for the functioning of all developed societies. 60 % of Switzerland’s electricity is currently generated from hydropower and 40 % from nuclear.

As part of our succession planning in the nuclear fuel division of Gösgen Nuclear Power Plant, we are looking for a Specialist Engineer for Supply, Interim Storage and Logistics

more

 

 

 
Home l Top l Disclaimer l Copyright l Webmaster